This procedure establishes the instructions to prepare tube ends and install and inspect axially swaged permanent tube fittings qualified to AS5958. This procedure is applicable when specified on the engineering drawing or in the procurement document.
Product Information
Published:
12/09/2013
File Size:
1 file , 880 KB
Language:
English
Note:
This product is unavailable in Ukraine, Russia, Belarus