IEEE 336-2005

IEEE Guide for Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Nuclear Facilities

IEEE , 02/23/2006

$44.00 $87.00
This guide provides considerations for the pre-installation, installation, inspection, and testing of Class 1E power, instrumentation, and control equipment and systems of a nuclear facility while in the process of installing, inspecting, and testing during new construction, modification, and maintenance. This guidance is applicable to initial construction, modification (backfit), and maintenance activities. This guide does not apply to periodic testing. The purpose of this guide is to identify the activities, instructions, and attributes that may be considered in the process of installing, inspecting, and testing during new construction, modification, and maintenance for Class 1E power, instrumentation, and control equipment at nuclear power stations.Changes to this guide are intended to ⎯ Review and consider "lessons learned" from industry (in particular, for post-modification and postmaintenance testing). ⎯ Provide a more comprehensive, organized "user-friendly" format. ⎯ Review and consider any other related user feedback. Revision Standard - Superseded. This guide provides considerations for the pre-installation, installation, inspection, and testing of Class 1E power, instrumentation, and control equipment and systems of a nuclear facility. This guidance is applicable to initial construction, modification (backfit), and maintenance activities. This guide does not apply to periodic testing.

Product Information

Published: 02/23/2006
Pages: 16
ISBN: 0738147842, 9780738147857
File Size: 1 file , 950 KB
Language: English
Note: This product is unavailable in Russia, Belarus
IEEE 336-2020
IEEE 336-2020

$30.00

IEEE 336-2010
IEEE 336-2010

$45.00

IEEE 336-2005
IEEE 336-2005

$44.00

Related Documents

IEEE C37.82-2017
IEEE 3810-2023
IEEE C57.147-2018
IEEE 644-2019
IEEE 644-2019

$34.00