IEC 61850-4 Ed. 2.0 b:2011

Communication networks and systems for power utility automation - Part 4: System and project management

International Electrotechnical Commission , 04/11/2011

$139.00 $278.00
IEC 61850-4:2011 applies to projects associated with process near automation systems of power utilities (UAS, utility automation system), like e.g. substation automation systems (SAS). It defines the system and project management for UAS systems with communication between intelligent electronic devices (IEDs) in the substation respective plant and the related system requirements. This second edition constitutes a technical revision to align the document more closely with the other parts of the IEC 61850 series, in addition to enlarging the scope from substation automation systems to all utility automation systems.

Product Information

Published: 04/11/2011
Pages: 74
File Size: 1 file , 510 KB
Language: English, French
Note: This product is unavailable in Ukraine, Russia, Belarus
IEC 61850-4 Ed. 2.1 en:2020
IEC 61850-4 Ed. 2.0 b:2011
IEC 61850-4 Ed. 1.0 b:2002

Related Documents

IEC 61753-042-2 Ed. 1.0 b:2014
IEC 60938-2-2 Ed. 1.0 b:1999
IEC 61400-12 Ed. 1.0 en:1998