ICC IBC-2021

2021 International Building Code

International Code Council , 2020

$78.00 $156.00
This code applies to all buildings except detached one- and two-family dwellings and townhouses up to three stories. The 2021 IBC® contains many important changes such as:
  • Puzzle rooms (escape rooms) are now defined and regulated as special amusement areas, requiring compliance with Section 411 and special means of egress requirements.
  • For the purposes of determining the allowable number of control areas in a building, each portion separated by one or more fire walls is now considered as a separate building.
  • In Group E occupancies, enhanced classroom acoustics in compliance with ICC A117.1 are to be provided in all classrooms having of volume of 20,000 cubic feet or less.
  • The requirements for metal composite materials and systems (MCM) installed on the exterior walls of Types I, II, III and IV construction were simplified and sprinkler allowances were deleted
  • The use of intermodal shipping containers as buildings is now specifically addressed through provisions intended to supplement existing applicable IBC requirements.
  • Automatic sprinkler protection is now required in Group S-2 open parking garages where any fire area exceeds 48,000 square feet.
  • The 2017 edition of ICC A117.1 was adopted.
  • Parapets of a minimum height are now required for aggregate-surfaced roofs to prevent blow-off.
  • Mixed occupancy buildings with assembly spaces are placed in Risk Category III when the total public assembly occupant load is greater than 2500 people.
  • The 2021 IBC snow map is updated to match ASCE 7-16 snow maps by adding a reference to ASCE 7 snow tables in states with large case study areas.
  • Secondary rain loads are updated to be consistent with ASCE 7.
  • Special inspection requirements were added to address the anchorage and connection of mass timber structural elements.
  • Installation of firestop, fire-resistant joint systems and perimeter fire barrier systems in residential-use buildings now requires special inspection in Group R fire areas having an occupant load exceeding 250 people.
  • Frost protection for egress doors was added to the foundation requirements.
  • ACI standards ACI 117 and ITG 7 were added by reference to provide acceptable tolerances for concrete construction.
  • Three new types of construction (Types IV-A, IV-B, and IV-C) allow mass timber buildings of taller heights, more stories above grade, and greater allowable areas compared to existing provisions for heavy timber buildings.

Product Information

Published: 2020
Pages: 833
ISBN: 9781609839550
File Size: 1 file , 26 MB
Language: English
Note: This product is unavailable in Russia, Belarus
ICC IBC-2024
ICC IBC-2024

$96.00

ICC IBC-2021
ICC IBC-2021

$78.00

ICC IBC-2018
ICC IBC-2018

$72.00

ICC IBC-2015
ICC IBC-2015

$72.00

ICC IBC-2012
ICC IBC-2012

$66.00

ICC NY-BC-2010
ICC IBC-2009
ICC IBC-2009

$63.00

ICC IBC-2006
ICC IBC-2006

$65.00

Related Documents

ICC FL-BC-HVHZ-2023
ICC VA-ECC-2006
ICC FL-BC-ENERGY-2023