CSA N287.6-94 (R2004)

Pre-Operational Proof and Leakage Rate Testing Requirements for Concrete Containment Structures for CANDU Nuclear Power Plants

CSA Group , 12/18/1999

$345.00 $690.00
1. Scope

1.1

This Standard provides the requirements for pre-operational proof tests and leakage rate tests of concrete containment structures of a containment system designed as Class Containment components. Note: Other components and appurtenances of the containment syst em may be tested coincident with the tests in this Standard, provided the intent of this Standard is observed and the requirements of CSA Standard CAN/CSA-N285.0 are considered.

Product Information

Published: 12/18/1999
Pages: 15
File Size: 1 file , 1.4 MB
Language: English
Note: This product is unavailable in Russia, Ukraine, Belarus
CSA N287.6:22
CSA N287.6:22

$345.00

CSA N287.6-11 (R2021)
CSA N287.6-94 (R2004)

Related Documents

CSA P.9.1:23
CSA P.9.1:23

$225.00

CSA R103:23
CSA R103:23

$50.00

CSA S406-16 (R2021)
CSA C22.2 NO. 248.4:00 (R2019)