BS PD IEC TR 60919-2:2008+A2:2020

Performance of high-voltage direct current (HVDC) systems with line-commutated converters-Faults and switching

BSI Group , 05/14/2020

$184.00 $368.30
This part of IEC 60919 which is a technical report provides guidance on the transient performance and fault protection requirements of high voltage direct current (HVDC) systems. It concerns the transient performance related to faults and switching for two-terminal HVDC systems utilizing 12-pulse converter units comprised of three-phase bridge (double way) connections but it does not cover multi-terminal HVDC transmission systems. However,certain aspects of parallel converters and parallel lines, if part of a two-terminal system, are discussed. The converters are assumed to use thyristor valves as the bridge arms, with gapless metal oxide arresters for insulation co-ordination and to have power flow capability in both directions. Diode valves are not considered in this report.Incorporates the following:PD IEC/TR 60919-2:2008+A1:2015

Product Information

Published: 05/14/2020
Pages: 68
ISBN: 9780539030150
File Size: 1 file , 2.5 MB
Language: English
Note: This product is unavailable in Ukraine, Russia, Belarus
BS PD IEC TR 60919-2:2008+A2:2020
BS PD IEC/TR 60919-2:2008+A1:2015
BS PD IEC/TR 60919-2:2008

Related Documents

BS PD CEN ISO/TR 11811:2012
BS AU 210-1:1987
BS 1902-5.11:1986
BS PD CEN/TS 16629:2024