ASTM E2675-09(2014)

Standard Practice for Property Management System Outcomes

ASTM International , 06/01/2014

$32.00 $64.00

1.1This practice describes expected outcomes associated with a property management system. It is a measure of achievement rather than process, and is descriptive rather than prescriptive.

1.2Outcomes are defined as information, events, objects, or states of being produced as a result or consequence of a plan, process, accident, effort, or other similar action or occurrence.

1.3An output measure is the tabulation, calculation, or recording of activity or effort and can be expressed in a quantitative or qualitative manner.

1.4An outcome measure is an assessment of the results of a program activity compared to its intended purpose.

1.5Consistent with Practice E2452, these outcomes are grouped into process management outcomes and operational outcomes.

1.5.1Although they may be directly related, strategies and tactics should not be confused with outcomes. Strategies are long-term plans of action designed to achieve a particular goal. Tactics are maneuvers or actions calculated to achieve some end. For example, increasing exercise is a strategy to attain the goal or outcome of fitness. Running is a supporting tactic to achieve the goal or outcome of fitness. Other tactics or groups of tactics may achieve the same outcome. On the other hand, as the definition of outcome indicates, tactics are not required for attaining outcomes. For example, fitness may be an unplanned result of a job requiring physical exertion.

1.6This practice describes the outcomes at a high level, with limited discussion of each outcome or components of each outcome. The intent is to provide a framework for current and potential additional standards. A cross reference relating current standards to the outcomes is provided in Section 5.

1.7The outcomes further described in Section 5, are listed in the following:

1.7.1Process Management Outcomes:

1.7.1.1Outcome 1-Mission Support

1.7.1.2Outcome 2-Accounting and Accountability

1.7.1.3Outcome 3-Information Management

1.7.1.4Outcome 4-Planning

1.7.1.5Outcome 5-Relationships

1.7.2Operational Outcomes:

1.7.2.1Outcome 6-Property Functionality

1.7.2.2Outcome 7-Resource Optimization

1.7.2.3Outcome 8-Property Visibility

1.7.2.4Outcome 9-Safety and Security

1.7.2.5Outcome 10-Installation, Movement, and Storage

1.8In Section 5, a rating scale is provided to quantify in a uniform manner achievement of outcomes and outcome components.

1.9This practice, in combination with Practice E2279, clarifies and enables effective and efficient control and tracking of property and may provide an enhanced basis for making decisions surrounding both property and property management systems.

1.10This practice is intended to be applicable and appropriate for all property-holding entities.

1.11This practice covers tangible property as defined in Terminology E2135. Consistent with the nomenclature used, individual portions of the practice may be applicable to more limited subsets of tangible property, for example to equipment and not to material.

1.12This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

Product Information

Published: 06/01/2014
Pages: 7
File Size: 1 file , 99 KB
Language: English
Note: This product is unavailable in Russia, Ukraine, Belarus
ASTM E2675-22
ASTM E2675-22

$30.00

ASTM E2675-09(2014)

Related Documents

ASTM C1708/C1708M-16
ASTM E1380-90(2015)
ASTM A995/A995M-13
ASTM E921-97(2010)