ASME BPVC.XI.2-2021

2021 ASME Boiler and Pressure Vessel Code, Section XI.2: Rules for Inservice Inspection of Nuclear Power Plant Components, Division 2, Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Power Plants

ASME International , 07/01/2021

$365.00 $730.00

Product Scope / Abstract

Provides requirements to maintain the nuclear power plant while in operation and to return the plant to service following plant outages. The rules require a mandatory program to evidence adequate safety and manage deterioration and aging effects. The rules also stipulate duties of the Authorized Nuclear Inservice Inspector to verify that the mandatory program has been completed, permitting the plant to return to service in a safe and expeditious manner. Application of this Section begins when the requirements of the construction code have been satisfied.

DIVISION 2
This Division provides the requirements for the creation of the Reliability and Integrity Management (RIM) Program for advanced nuclear reactor designs. The RIM Program addresses the entire life cycle for all types of nuclear power plants, it requires a combination of monitoring, examination, tests, operation, and maintenance requirements that ensures each Structure, System, and Component (SSC) meets plant risk and reliability goals that are selected for the RIM Program.


View presentation of key changes to the 2021 BPVC (PDF)

Product Information

Published: 07/01/2021
Pages: 151
ISBN: 9780791874295
Language: English
Note: This product is restricted and cannot be purchased in the following countries Ukraine, Russia, Belarus
ASME BPVC.XI.2-2021
ASME BPVC.XI.2-2019

Related Documents

ASME B16.47-2006
ASME B18.12-2001 (R2006)
ASME B30.19-2000
ASME BTH-1-2020