ASME B30.18-2021

Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist)

ASME International , 09/30/2021

$30.00 $59.00

ASME B30.18-2021 PDF

B30.18 applies to the construction, installation, operation, inspection, and maintenance of hand-powered and power-driven overhead and gantry cranes that have a top or under running multiple girder bridge with a vertically guided carriage, with or without a top or under running trolley. The requirements included in this volume also apply to stacker cranes having the same fundamental characteristics, such as cantilever gantry and semi-gantry stacker cranes.

Product Information

Published: 09/30/2021
Pages: 38
ISBN: 9780791874653
File Size: 1 file , 460 KB
Language: English
Note: This product is unavailable in Ukraine, Russia, Belarus
ASME B30.18-2021
ASME B30.18-2004 (R2009)
ASME B30.18-1998

Related Documents

ASME B107.600-2016 (R2021)
ASME STP-NU-061-1
ASME BPVC-III NF-1989
ASME B107.38M-1998 (R2004)