API RP 95F:2007

Gulf of Mexico MODU Practices for the 2007 Hurricane Season - Interim Recommendations (WITHDRAWN - REPLACED BY APPENDIX K TO API 2SK)

American Petroleum Institute , 04/01/2007

$70.00 $140.00
This Recommended Practice supersedes RP 95F, First Edition, May 2006. RP 95 supplements API RP 2SK, RP 2I, and RP2SM for Gulf Of Mexico MODU mooring design, operation, inspection and maintenance practices during hurricane season. Topics addressed in RP 95F that will be part of the overall mooring design and MODU operations include:
  • Mooring Analysis
  • Mooring Design Criteria
  • Consequences of Failure
  • Indicative GOM hurricane extreme metocean conditions
  • Site-specific risk assessment and mitigation
  • Mooring hardware issues such as anchor system considerations and mooring system improvements
  • Mooring operation issues such as deployment, hurricane preparedness, and inspection

This RP was developed through a cooperative arrangement with the American Petroleum Institute's Subcommittee on Offshore Structures - RP 2SK Task Group, the API Executive Committee on Drilling and Production Operations, and the Joint Industry Project entitled "US Gulf of Mexico Mooring Strength Reliability" (MODU JIP).

Product Information

Published: 04/01/2007
Pages: 42
File Size: 1 file , 760 KB
Language: English
Note: This product is unavailable in Russia, Cuba, Syria, North Korea, Ukraine, Belarus, Iran
API RP 2SK:2024
API RP 95F:2007
API RP 95F:2006
API RP 2SK (R2015)
API RP 2SK:1996

Related Documents

API Spec 2C
API Spec 2C

$90.00

API TR 938-C:2024
API RP 64 (R2012)
API Std 5T1 (R2010)