API RP 1172 (R2020)

Recommended Practice for Construction Parallel to Existing Underground Transmission Pipelines, First Edition

American Petroleum Institute , 04/01/2014

$48.00 $96.00

API RP 1172 (R2020) PDF

Construction activities parallel to existing transmission pipelines, for any distance, are the focus of this recommended practice (RP). Activity of concern includes construction activity that could impact an existing facility, such as excavation or movement of equipment across the pipeline or within the easement that could affect the safe operation of the existing pipeline. This RP is intended as a resource to assist all parties to safely manage construction activities of new or modified facilities parallel to existing underground transmission pipelines.

The primary emphasis of these guidelines is on the interaction between existing transmission pipeline operators and those planning to construct in a parallel fashion. Contractors working on behalf of the constructing party, including environmental and survey professionals, design engineers, construction contractors, and operators of excavation and earth moving equipment, are encouraged to engage in work practices that are in conformance with these guidelines. These guidelines have been developed such that they can be incorporated into contract documents executed with contractors and subcontractors by whichever party is involved in or responsible for construction activities.

Product Information

Published: 04/01/2014
Pages: 30
File Size: 1 file , 2.9 MB
Language: English
Note: This product is unavailable in Russia, Cuba, Syria, North Korea, Ukraine, Belarus, Iran

Related Documents

API RP 556 (R2024)
API TR 10TR5
API TR 10TR5

$35.00

API 5C6:1996
API 5C6:1996

$72.00

API Std 610:1995