PIP PLE00009:2024

Potholing Guideline

Process Industry Practices , 05/01/2024

$50.00 $100.00

The purpose of this guideline is to describe when and why potholing is utilized for construction and design activities, potholing methods, advantages and disadvantages of the methods included, and one-call resources. Potholing may be utilized, as required and described herein, to prevent excavation damage to underground utilities and to avoid unknown foreign utilities.​

Product Information

Published: 05/01/2024
Pages: 12
File Size: 1 file , 330 KB
Language: English
Note: This product is unavailable in Ukraine, Russia, Belarus

Related Documents

PIP PN03CS1S02
PIP PNC00004
PIP PNC00004

$50.00

PIP PCCTE001
PIP PCCTE001

$50.00

PIP VECQ1001-F-EEDS